BlueGrey
calm
Elegant
Català-Valencià – Catalan
中文 – Chinese (Simplified)
中文 – Chinese (Traditional)
Česky – Czech
Dansk – Danish
Nederlands – Dutch
English – English
Suomi – Finnish
Français – French
Deutsch – German
עברית – Hebrew
हिंदी – Hindi
Magyar – Hungarian
Bahasa Indonesia – Indonesian
Italiano – Italian
日本語 – Japanese
한국어 – Korean
Македонски – Macedonian
मराठी – Marathi
Norsk – Norwegian
Polski – Polish
Português – Portuguese
Português – Portuguese (Brazil)
Русский – Russian
Slovenčina – Slovak
Slovenščina – Slovenian
Español – Spanish
Svenska – Swedish
Türkçe – Turkish
Українська – Ukrainian
Oëzbekcha – Uzbek
Subversion Repositories
SmartDukaan
(root)
/
trunk
/
runutils
/
copy-wars-to-production.sh
@ 3460
– Rev 0
Rev
Show changed files
|
Details
|
Compare with Previous
|
Blame
|
RSS feed
Filtering Options
From rev
To rev
Max revs
Search history for
Show All
Rev
Age
Author
Path
Log message
Diff
3167
5248 d 13 h
rajveer
/trunk/runutils/
Update svn revision on both prod servers
3147
5249 d 10 h
chandranshu
/trunk/runutils/
Added support to deploy website on the 2nd production server as well
3146
5249 d 10 h
chandranshu
/trunk/runutils/
Ensured that the war is also copied to the second production server
3041
5256 d 12 h
rajveer
/trunk/runutils/
Updated script file for copying war to support and product server.
2858
5273 d 7 h
chandranshu
/trunk/runutils/
Added support to specify the deployment server as an argument
2713
5286 d 8 h
vikas
/trunk/runutils/
Deploy crm as well
2376
5312 d 12 h
rajveer
/trunk/runutils/
Modified the script to put svn revision on production
2084
5336 d 11 h
rajveer
/trunk/runutils/
Added scripts to Phase out one item. Generate content for one entity. Update content for one entity. Added checkout timestamp of the build on production.
1843
5360 d 8 h
rajveer
/trunk/runutils/
Added script to copy war from staging to production